Close up of the pier after dewatering. The stone are sitting on the river bed abd are not anchored. On the downstream side (behind the machine) there was a gap of 8 - inches under the stones where material had washed out over the years. A concrete collar was poured around the pier with reinforcing steel drilled into the pier and the bottom.