This shot was taken after completion of Stage 1. Traffic has been shifted to the new road. The rigid frame can be seen on its footing. To the right is temporary sheeting to retain the road during this stage of construction. The red cables coming through the holes on the frame are the post tensioning cables. These are used to pull the sections of the frame (nine in total) tightly together.