Girder bridge looking west. When built, the deck was concrete. Years later, because of the deteriorating condition of the bridge, the concrete deck was replaced with an open grid steel deck, and the concrete encasement was removed from the floor beams to lighten the bridge. The load limit was also reduced.

          previous                                                          Studdiford main page                                                                                next